Turbine flowmeter installation precautions

Time: 2020-02-20 12:02:50 Click:0
Turbine flowmeter installation precautions is following:

(1) Installation site
The turbine flowmeter sensor should be installed in a place where maintenance is easy, and the pipeline is free from vibration, strong magnetic interference and heat radiation. When installed outdoors, there should be measures to avoid direct sunlight and rain.
(2) Installation requirements and precautions
The sensor installed horizontally of the turbine flowmeter requires that the pipeline should have no observable tilt (within 5 deg;). The vertical deviation of the sensor installed vertically should be less than 5 deg;, and the fluid direction should be downward and upward.
Where the flow cannot be stopped, bypass and stop valves should be installed.
If the fluid contains impurities, a filter should be installed on the upstream side; if it contains gas, a deaerator should be installed on the upstream side. The drain and air outlet of the filter and the air cleaner should lead to a safe place.
The flow regulating valve should be installed downstream of the sensor, and the upstream shut-off valve should be fully opened during measurement, and must not cause vibration and external leakage. For processes that may produce reverse flow, check valves should be added to prevent reverse flow of fluid.
The sensor should be concentric with the pipeline, and the sealing gasket must not protrude into the pipeline. The sensor should no longer be at the high point of the pipeline, so as to prevent the gas accumulated in the pipeline (such as air mixed in when the flow is stopped) staying at the sensor, which is difficult to discharge and affect the measurement.
The pipes at the front and rear of the sensor should be supported firmly without vibration. For condensable fluids, heat insulation measures should be taken for the sensor and its front and rear pipes.
Transmission cables are usually two-core or three-core with shielded signal cables. The shielded signal cables should be grounded at the end of the display instrument (flow totalizer or flow calculation controller). The transmission path should not be parallel to the power supply line. Area where lines are concentrated.
Turbine flowmeter installation precautions
Article from:yibiaohui

TheTurbine flowmeter is one of the main products of the NOIKE. For more information, please visit the product page orZANKE staff.
主站蜘蛛池模板: 久久精品免视看国产成人2021 | 欧美又粗又长A片XXOO在线看 | 求av网站 | 精品无码一区二区三区不卡 | 五月婷婷久久草丁香 | 99久久精品免费精品国产 | jizz亚洲高清在线观看 | 视频黄页在线观看 | 国产日本一线在线观看免费 | 免费一级特黄特色大片在线观看 | 午夜伦理:伦理片 | 裸体丰满少妇P做爰 | 久久精品免费i 国产 | 亚洲精品久久蜜臀AV色欲 | 最近新免费韩国电影高清 | 欧美牲交A欧美牲交VDO | 波多野结衣教师中文字幕 | 99爱视频精品免视看 | 天堂岛最新版在线bt天堂 | 国产一级二级在线 | 国产精品国产高清国产专区 | 一摸二插 | 免费人成在线观看69式小视频 | 亚洲永久精品AV在线观看 | 大量国产激情视频在线观看 | 在线网站黄色 | 日本公妇里乱片A片在线播放保姆 | 日本无码欧美激情在线视频 | 夜夜穞天天穞狠狠穞AV美女按摩 | 四虎影视2024在线播放a | 成人免费视频l免费观看 | 国产亚洲精品久久久久久入口 | 欧美亚洲日韩国产网站 | 国产精品99久久久久久WWW | 国产精品扒开腿做爽爽爽王者A片 | 国产精品免费网站 | 亚洲精品第一页中文字幕 | 在线观看网站国产 | 国产亚洲精品品视频在线 | 一个人免费看的视频www | 国产成人自产拍免费视频 |